Objective
The primary objective of installing the energy storage plant at the substation was to maximize the utilization of excess daytime solar energy for substation auxiliary loads during peak evening hours between 6-10PM, where net metering is not applicable. Additionally, the BESS was also planned for reducing the reliance on diesel generators during grid outages. This approach aimed to optimize renewable energy usage, reduce operational costs, and minimize environmental impact.